Backwater Valve Installed With Maintenance Access
The sanitary line route was confirmed before the floor was opened. The valve was installed with proper flow direction and an accessible cover for future inspection and cleaning.
The sanitary line route was confirmed before the floor was opened. The valve was installed with proper flow direction and an accessible cover for future inspection and cleaning.